COMPLETE RENEWAL OF THE RITOM POWER PLANT

The construction work for the complete renovation of the Ritom power plant in Ticino is running in full speed. The project includes the construction of a headrace tunnel, a new power plant centre and an equalising reservoir with a capacity of 100,000 m3.  The renewal of the power station, built in 1920, will last until spring 2022. A material cableway with a payload of 12 tons is available for the logistics.