New construction water power plant Engstligenalp, Adelboden BE
Ropeway with radio controlled motor cable crane
Download the newspaper report PDF (German)
Year: 2010/11, Capacity: 5 Tons
Parallel hydropower shaft Kapf Innertkirchen BE
Ropeway with 700 kW electro-mechanical drive and radio controlled double drum motor cable crane
Download the newspaper report VTK PDF (German)
Download the newspaper report KWO PDF (German)
Year: 2012, Capicity: 20 tonnes
Dismantling ropeway system Linth – Limmern
Ropeway with electro-mechanical drive and radio cotrolled double drum motor cable crane
Year: 2016, Capacity: 12 Tonnen
New power plant for Jungbach AG in St. Niklaus VS
The construction for the new power plant is underway.
A materials ropeway was erected in order to supply the construction site and for the building of a new rock cavern. The cable car was designed for a carrying capacity of ten tonnes. The complex cable system is completed and the construction work for the power plant is in full progress. The cable car is key to the entire project; without it, nothing gets up to the site.