References special installations
Transport of a 60-ton drill bit on the ground
For the construction of a natural gas pipeline, a short tunnel of about 400 meters was drilled in rough terrain.
Ropeway technology from ZINGRICH Cabletrans GmbH enabled a safe displacement of the 60 ton drill head.
Year: 1997
Construction machine securing
Transport and securing of a 40 tons digger in extremely steep terrain
Year: 1998