Transport of a 60-ton drill bit on the ground

For the construction of a natural gas pipeline, a short tunnel of about 400 meters was drilled in rough terrain.

Ropeway technology from ZINGRICH Cabletrans GmbH enabled a safe displacement of the 60 ton drill head.

Year: 1997

Construction machine securing

Transport and securing of a 40 tons digger in extremely steep terrain

Year: 1998