V-BAHN PROJECT MATERIAL ROPEWAY SALZEGG-EIGER GLACIER

For the construction of the visionary V-Bahn, a material ropeway is being used to access the high-mountain construction site on the Eiger Glacier. The material ropeway has a payload of 6 tons and forms an important link in the logistics chain of the entire construction site. The material ropeway brings the material just in time to the narrow construction site Eigergletscher. The availability of the material ropeway is essential for the sometimes very large concrete stages.