Replacement water intake Power plant Bözingen, Biel BE

Cable crane system with electro-hydraulic drive

Year: 2010/11, Capacity:  5 tons

New construction water power plant Engstligenalp, Adelboden BE

Ropeway with radio controlled motor cable crane

Download the newspaper report PDF (German)

Year: 2010/11, Capacity:  5 Tons

New force pipe power plant Giessbach, Brienz BE

Ropeway with radio controlled motor cable crane

Year: 2011, Capacity:  3 tonnes

New force pipe power plant La Vièze Monthey VS

Ropeway with electro – mechanical drive and traversable 20 degrees mats and radio controlled motor cable crane

Year: 2011, Capacity:  7 tons

Parallel hydropower shaft Kapf Innertkirchen BE

Ropeway with 700 kW electro-mechanical drive and radio controlled double drum motor cable crane

Download the newspaper report VTK PDF (German)

Download the newspaper report KWO PDF (German)

Year: 2012, Capicity:  20 tonnes

Renovation Power plant FMO Orsières

Ropeway with electro-mechanical drive and radio controlled double drum motor cable crane

Year: 2016, Capacity:  12 tons

Dismantling ropeway system Linth – Limmern

Ropeway with electro-mechanical drive and radio cotrolled double drum motor cable crane

Year: 2016, Capacity:  12 Tonnen

Download Factsheet PSW Limmern PDF

New power plant for Jungbach AG in St. Niklaus VS

The construction for the new power plant is underway.

A materials ropeway was erected in order to supply the construction site and for the building of a new rock cavern. The cable car was designed for a carrying capacity of ten tonnes. The complex cable system is completed and the construction work for the power plant is in full progress. The cable car is key to the entire project; without it, nothing gets up to the site.