New construction aerial cableway Plan Francey – Mt. Moléson
Ropeway with 250 kW diesel-hydraulic drive, and radio controlled motor cable crane
Year: 2010, Capacity: 8 tonnes
Download the newspaper report Journal de Gruyère PDF (French)
New combined cablecar Riederalp – Moosfluh
For the replacement infrastructure cablecar Riederalp – Moosfluh a material ropeway system was erected.
The material cablecar is starting with a right hand turn shortly after the departure, afterwards the cablecar line is parallel to the new combined cablecar.
The Cablecar system with a capacity of 5 tonnes was a elementary part of the construction plcace Blausee und Moosfluh.