Assembly Tung Chung Cable Car, Hong Kong

Assembly in a very difficult aera

Year: 2005

Rebuilding cable car Lauterbrunnen

Ropeway with 250 kW electro-hydraulic drive, and radio controlled motor cable crane

Year: 2006, Capacity:  7

Restoration cable car Mont Pèlerin, Chardonne

Ropeway with 2 down holder mast under a high voltage power line, and radio controlled motor cable crane

Year: 2009, Capacity:  5 tonnes

New construction aerial cableway Plan Francey – Mt. Moléson

Ropeway with 250 kW diesel-hydraulic drive, and radio controlled motor cable crane

Year: 2010, Capacity:  8 tonnes

Download the newspaper report Journal de Gruyère PDF (French)

Download the newspaper report Moléson Battimag PDF (French)

New construction – Cable car “Cabrio” Stanserhorn

Ropeway with 130 kW diesel-hydraulic drive, and radio controlled motor cable crane

Year: 2011, Capacity:  4,5 tonnes

New combined cablecar Riederalp – Moosfluh

For the replacement infrastructure cablecar Riederalp – Moosfluh a material ropeway system was erected.

The material cablecar is starting with a right hand turn shortly after the departure, afterwards the cablecar line is parallel to the new combined cablecar.

The Cablecar system with a capacity of 5 tonnes was a elementary  part of the construction plcace Blausee und Moosfluh.